Globalsportsclimate

Eligibility Check for Field Drainage Audit

Not every pitch needs a full subsurface redesign. Submit your field parameters and we will assess whether your drainage issue requires a porosity audit, a pipe network adjustment, or a gravel-layer retrofit. This check is the first step before any on-site engineering visit.

Typical eligibility criteria: field area above 6000 m², annual rainfall over 800 mm, visible surface pooling lasting more than 20 minutes after a 10 mm event.

After submission: you will receive a preliminary feasibility note within 2 business days. No commitment required.

We will not share your data. This check is free and non-binding.

Contact

Direct lines for field engineering inquiries and project coordination.

Office

4005 Swart Flat Apt. 510

Phone

033-530-0857

Email

info@globalsportsclimate.com

Office Hours

Monday – Friday: 08:00 – 18:00

Saturday: 09:00 – 14:00

Sunday: Closed

Preferred Channels

For urgent drainage or porosity audits, call or text the office line. Detailed project proposals and soil data are best sent via email. We respond to all inquiries within one business day.

Cookie settings

We use cookies to keep the site reliable, remember basic choices, and understand which pages are useful. You can accept, reject, or review the settings before continuing.